How do cross-project links work?
Can projects as a whole or parts of projects be linked into other projects?
Projects in portfolios can be linked to all connection possibilities. The risk analysis works in real time at this point, i.e. if there are overlaps, this is shown as a red light and in the analysis of the AI.
Cross-project linking of all planning elements is also possible. To do this, the projects must be opened simultaneously (in the PlannerApp), then a connection can be created with the mouse or with a dialogue.
Of course, the risk analysis of linkage also works when only one project is open.
In the field "minimum duration", a distance between the chained objects can be defined. If this is not reached, Can Do warns with a risk.
Any number of linkages can be created.