Risk matrix with bubble chart
How can a risk matrix of projects be visualised in relation to the benefits?
The preferred visualisation here is the bubble chart. On the X-axis, the total risk of a project (risks determined by Can Do and risk defined manually by the user) is shown in weighted form. On the Y-axis the benefit (score) of the project (can also be seen as a priority). The diameter of the circle reflects the effort.
In the course of 2022, it is planned that all fields of Can Do will be arbitrarily adjustable in this matrix.